“Bed removal” can mean one mattress or an entire setup. List every part before emailing so the estimate covers the actual job.

Build the bed inventory

ComponentWhat to noteWhy it matters
MattressSize, count, conditionControls volume and handling
FoundationRigid, split, platform, adjustableChanges weight and exit plan
FrameMetal, wood, upholsteredMay separate into smaller parts
HeadboardWidth, height, wall mountingMay need separate access planning
Slats and hardwareLoose, attached, baggedSmall parts need containment

Do not assume disassembly is included

Ask what the crew can separate and what must be ready beforehand. Adjustable bases and powered components can be much heavier than a standard frame. Disconnect power only according to the manufacturer's instructions, and do not attempt a lift that blocks your view or exceeds your safe capacity.

Photograph the assembled bed

One wide photo and one close photo of brackets or powered components can answer questions faster than a long description. Include the doorway and any stair turn if access looks tight.

Use the bed removal page to review scope, then email the component list.

Sources checked

Safety guidance: U.S. Occupational Safety and Health Administration. Local disposal and recycling details: Wilson County, Tennessee; Rutherford County, Tennessee; and the U.S. Environmental Protection Agency. Research retrieved October 14, 2026.